How an incident moves from draft to closed, how to hand it to another officer, and how a non-author's edit is staged for the author's approval.
Loading…
What this does not do
the state machine only moves forward — reopening a closed incident is a separate, gated act limited to the author or an admin. Not a legal chain of custody.
Every incident carries a status, and that status only ever moves forward: no
report slides back into an earlier state by accident, and no stray edit
overwrites a report someone already signed off on.
The states a real incident moves through
A real incident (not a training drill) moves through up to seven states, in
order: Draft → Report Finalized → Handed Off → In Reconstruction → Ready
for Review → Under Review → Closed.
Most incidents never need the middle states. If the officer who ran the call
also writes it up, the record goes from Draft to Report Finalized and
then closes directly with Close incident (below); the handoff and review
states exist for the case where someone else does the reconstruction. A
training drill takes a shorter path: Draft → Finalized → Under Review →
Closed.
Handing an incident to someone else
If the officer who ran the call is not the one who will write the final
report, use Hand Off from a finalized incident. Pick a recipient from the
department roster and an optional note; the incident moves to Handed Off.
The recipient sees Accept Handoff; accepting moves it to In
Reconstruction, where only they (or an admin) can finish it. Finishing moves
it to Ready for Review and notifies the original author that the
reconstruction is ready.
The notification bell shows each step — "Incident handed off to you" for the
recipient, "Handoff accepted" and later "Reconstruction ready for review" for
the author
— and clicking one opens the incident directly.
Closing directly, and reopening
From Report Finalized through Ready for Review, a secondary Close
incident button is available to the author, the current owner, or an admin.
It skips whatever review steps remain — a shortcut for when the rest of the
pipeline doesn't apply. The normal Under Review → Closed step still
completes review the usual way, and closing does not lock the incident: it
stays open, editable, and exportable.
Closed is the one state with a way back. The author, or an admin, can
reopen a closed incident, returning it to an editable rework state and
notifying the current owner — a separate, gated action, not a routine pipeline
step, and not available to anyone else.
Proposing a change after the fact
Once a report is finalized, only the author (or an admin) can edit it
directly. Anyone else who edits the same incident sees a notice that the edit
will be staged instead of applied. The author is notified ("Change request
submitted"), opens the request, and sees a changed-fields-only comparison
of what's proposed against what's there now — then Approve Changes, which
applies the edit, or Revert Changes, which discards it. The proposer is
notified either way.
If the record moved underneath the request while it was waiting, approval is
refused rather than silently applied over the newer version, and the reviewer
is pointed at the current values instead.
What trend reports leave out
Draft incidents never appear in trend analytics — a report only counts once
it has left Draft.