At a working fire, water rarely comes from one engine. One engine is the base pumper, the attack engine the handlines come off. Others are supply pumpers that lay a line from a hydrant or relay water toward it. And a line is often laid and connected minutes before anyone sends water into it, and it can be shut off and charged again. The marks on this page record that on the board, and Water Supply and Secondary Water read them. Replay draws each lay, shows a line that's ready but not charged as flat hose, and shows the water flowing while each line is charged.
Set an engine's Function
In edit mode, select a placed engine or quint on the map. The bar at the bottom of the map shows Function, with three choices:
- Base pumper: the attack engine. A water supply chain always ends here.
- Supply pumper: an engine that pumps water toward the base pumper, from the source or in a relay. A chain never ends here, so its water has to reach a base pumper, or an engine with no Function, for Water Supply to check.
- None: the unit counts the way it always has.
The Function is set for this incident only, because the same engine can be the base pumper at one fire and a supply pumper at the next. It stays with the unit when you move it, or remove it and place it again. A tiller quint has one, as a quint does. Trucks and other units don't, including a brush truck, a wildland engine, and a crash truck: they carry water and hose, but they don't pump in a supply chain or lay a supply line. A viewer sees the choice but can't change it.
Mark how a supply line was laid
Select the unit a supply line comes from and open the Units tab. A supply line, one of 3 inches or more that isn't assigned a handline role, has a Laid by row:
- Choose the engine that laid the line. The list shows the engines and quints on the map, with the line's own unit first.
- Choose Lay-out, a reverse lay from the receiving engine to the source, or Lay-in, a forward lay from the source to the receiving engine.
- In Start, type when the lay started as mm:ss, or select mark to use the playhead's position.
When the lay is set, the app finds the receiving end, the end of the line at a unit other than the engine that laid it, and the row names that unit, for example "Lay-out from E3". It finds that end once and keeps it, so a unit that moves later doesn't turn the lay around. One end of the line has to be within 15 feet of another unit's center, or 25 feet at a relay's far end. A longer unit reaches farther at a relay's far end, half its diagonal: about 29 feet for a tiller and 30 feet for a tiller quint. For a tractor-drawn unit, each distance is measured from where its center would be with the trailer straight, so a relay end at the tail of a sharply jackknifed trailer can fall out of reach. When the line has a Target, the Target's end is the receiving end instead, wherever the unit is, as Set where the water comes from and goes describes.
A first-due engine often lays in to its own intake: it stops at the hydrant, the end comes off its bed and wraps the hydrant, and the engine lays in to the fire and pumps from that line. When you choose Lay-in and no other unit is at either end of the line, the engine that laid it is the receiving unit, and the row reads "Lay-in to its own intake". When the line comes from that engine, the end at the engine is the end the line was drawn from; otherwise it's an end within 15 feet of the engine's center.
If no unit is at either end, or units are at both, the lay isn't set and a message says why. A Lay-out always needs another unit at one end.
A line you charged while you drew it was charged as it went out, so no Start fits before its first charge. To set Laid by, first move its first On time later, or clear Charged.
Once the lay is set, choosing another engine or lay updates it. Clear Start to remove it. On a line with a lay, Time to target is when the engine finished the lay.
A line laid in to another engine counts differently from one laid out. It runs from its source straight to that engine: the engine that laid it only carried the hose, so its pump isn't on that line. An engine that laid in to its own intake receives the water and pumps, so it stays on its line. Hard suction is never laid, so it has no Laid by row.
Set where the water comes from and goes
A supply line has Source and Target on its row. Each opens on Auto, which names what the app finds at the line's ends, for example "Auto · E3". Leave them on Auto and the app decides, as it always has. Choose an entry to record it, even one that matches Auto:
- Source is where the line gets its water: a hydrant or a unit.
- Target is the unit the line supplies, an aerial or a tower included.
Each list starts with what stands at the line's ends, then the rest of the board. A choice applies to the end of the line nearer that unit or hydrant, at any distance, so a hydrant drawn more than 15 feet from the end still connects. Source and Target can't both be nearest the same end. Choosing either marks the line, so it counts toward Water Supply once it's charged.
A choice names the unit, not a place. If the unit moves more than 25 feet from the line's end, the choice holds, and the row says "E3 is no longer at this line's end." If the unit is removed from the map, that end is Auto until the unit comes back, and the row says so. A Target also decides a lay's receiving end: on a Lay-in, a Target that's the engine that laid the line makes it a lay-in to its own intake, and a Lay-out can't have that engine as its Target. A Source can't be at the end a lay runs to.
Hard suction has neither: it always runs from the water into its own engine.
Mark when water is sent and shut off
Supply lines and hard suction have a Charged box. Check it when water is sent into the line, and clear it when the line is shut off. Each change is logged at the playhead, rounded to the second, and a line can be charged and shut off as many times as it happened. After the box, the row lists each change, On and Off, as an mm:ss time:
- To move a change, type a new time. Each time has to fall after the change before it and before the change after it.
- To remove a change, clear its time. A change it leaves next to another of the same kind goes with it, and so does a shut-off it leaves first.
- A change in the same second as the line's last one removes that last one instead, so a line is never charged and shut off in one second.
- If the playhead is before the line's last change, the change is refused. Move the playhead past it, or type the time into the list.
A line drawn before these marks, or one nobody marked, shows the box as mixed (—): nothing says whether it was charged, and it counts as water from when it was laid. The first click checks it. A charge doesn't log a timing milestone.
While you draw a line of 3 inches or more, Details on the drawing bar at the top of the map opens Source, Target and Charged; hard suction shows Charged only. What you choose there is saved with the line when you finish it, and checking Charged logs the line's first charge at the second it's laid. If your Source and Target are nearest the same end of the line, the bar says so, and Done sets neither. The line's row holds all three afterward.
The row also says what the line is now:
- "Flows to E3": the line is charged, and the row names the unit the water flows to, or why the line has no direction, as Watch the water flow describes.
- "Ready for water at E3": the line is marked, laid, connected at both ends and not charged. After a shut-off, it reads "Shut off at 09:40. Ready for water at E3."
- "Not connected: one end isn't at a unit or a hydrant.": the line is marked and not charged, and one end is open.
- "Not recorded: counts as water from when it was laid.": the line isn't marked.
When each time can fall
Each mark has to fit the order things happened in. A time that doesn't is refused, and a message says why:
- Start is at or after the moment the line went out, and at or after the laying engine was placed.
- Start is before Time to target and before the line's first charge.
- The first charge is at or after the moment the line went out, after Start, and at or after Time to target.
- Each shut-off is after the charge before it, and each later charge is after the shut-off before it.
Times are compared to the second, the way mark rounds the playhead, so a time in the same second as the line going out, or as the laying engine's placement, counts as that moment.
To start a lay before the line's or the engine's recorded time, change that entry's time in the event log first. The marks never move those entries.
What Water Supply reads
On the Tactics tab, Water Supply and Secondary Water read these marks only where they're set, so a board with none of them checks exactly as before. Hydrants on the map describes the rule itself.
- A base pumper always ends a chain, and a supply pumper never does. One supply pumper that every chain passes through leaves Secondary Water unchecked.
- A line laid in to another engine connects its source straight to that engine, without the engine that laid it. A line an engine laid in to its own intake counts the same as a line with no lay.
- A line's Source or Target connects its end to what it names, in place of what's within 15 feet.
- A line is marked when it has a lay, a Source or Target, or a charge. In replay, a marked line counts only while it's charged, so a shut-off clears Water Supply unless another chain still carries water, and the next charge checks it again. In edit mode, a marked line counts once it was ever charged: a line shut down at overhaul still shows that supply was established.
- A marked line that was never charged counts toward neither box. A line nobody marked counts from the moment it was placed, as before.
- A chain ends at an engine or a quint, so a charged line into a truck's or tower's waterway checks neither box. It still shows its arrows and its record.
A change on September 28, 2026: a line with a lay and no charge used to count from the moment it was placed. It now counts only once it's charged, so a replay of an incident marked before then can check Water Supply later than it did. Check Charged at the moment water was sent to bring it back.
Watch a lay in replay
On the 2D map, in 3D, and on a shared replay link, replay draws each lay that has a Laid by engine and a Start time. From the moment it's placed, the engine that laid the line waits where the lay starts. At Start, it drives along the line you drew, and the hose pays out of its bed behind it.
- Lay-out: the engine waits beside the receiving engine, with its hose bed at the end of the line there, and drives to the water source. The line shows from the receiving engine to the engine's bed.
- Lay-in: the engine waits at the water source and drives toward the receiving engine while the hose pays out from the source. It stops one engine length short, so the two engines never overlap, and the last length of hose appears when the lay ends.
- A lay-in to the engine's own intake: the engine waits at the water source and drives the whole line to where it's placed on the board.
The lay ends at the line's Time to target time. Without one, it ends when the engine has driven the line's length at 15 miles per hour, and never later than the line's first charge. When the lay ends, the engine takes its position on the board and the line shows whole.
The drive is a drawing between two recorded times, the start of the lay and its end. The app doesn't know the route the engine took or how fast it went, so it draws a steady pace along the line you drew. To replay a lay at the pace it took, mark its Time to target.
- With reduced motion turned on in your device's settings, nothing drives: the engine waits where the lay starts until the lay ends, and then takes its position, and the line shows whole.
- In edit mode, the board shows every line and unit where they finished.
- In Street View, the engine moves along the line, but the line shows whole.
- On a shared replay link, each unit is a plain marker, and the engine that laid the line moves along it as the hose pays out.
See a line that's ready for water
On the 2D map, a marked supply line that's laid, connected at both ends and not charged is drawn as flat hose: in its own color, half again as wide, with a dark core a third of its width, or a white core on a black hose. Solid means water; hollow means none yet. A relay line's dashes go hollow the same way.
- In replay, the line lies flat once the lay ends, fills out at its charge, and lies flat again after a shut-off. The change is a cut, never an animated fill, because the app doesn't know how long a line took to fill.
- In edit mode, the line shows its state after its last change.
- A line with an open end, a line nobody marked, and a line still being laid draw as they always have.
- Off the ground floor, the floor's line pattern shows instead, and hard suction keeps its own marks.
- 3D, Street View and a shared replay link don't draw flat hose.
Watch the water flow
On the 2D map and on a shared replay link, a supply line or hard suction shows water moving through it while it's charged: blue arrows run along the line from the water source toward the base pumper. In replay, a line's arrows run from each charge to the next shut-off and never at any other time, so in a relay each line starts to flow at its own time. A line that's never charged never shows arrows, and neither does a handline.
The app works out which way the water runs from what's on the board, never from the direction the line was drawn in, because a reverse lay is drawn from the engine back to the hydrant:
- A line with a Target runs toward it, and a line with only a Source runs away from it. These settle the direction before anything else, and a Source hydrant starts the arrows at its marker.
- A line with a lay runs toward its receiving engine. A lay-out runs from the source through the engine that laid it, a lay-in to another engine runs from the source straight to that engine, and a lay-in to the engine's own intake runs to that engine.
- Hard suction runs from the water into its engine.
- A line with a hydrant at one end runs away from the hydrant, and its arrows start at the hydrant. A hydrant at the same end as a base pumper doesn't count, because water never leaves a base pumper along a supply line.
- A line from one unit to another runs along the supply chain toward the base pumper or, with no base pumper, away from the water source. A line from the base pumper to a unit it supplies runs away from the base pumper: a truck or other unit that can't pump, or a quint with its aerial deployed that isn't the base pumper and gets no water of its own from a hydrant or its own hard suction. A tanker, or tender, is the exception: it nurses the base pumper, so a line between them runs into the base pumper.
For the arrows, the base pumper is the engine or quint whose Function is Base pumper. While no engine or quint on the map has that Function, an engine or quint with a handline off it counts as the base pumper, unless its Function is Supply pumper. A handline here is a line assigned to attack, backup, exposure or search. Setting a Base pumper anywhere on the map turns this off.
When none of these settles the direction, the line shows no arrows. The Charged row reads back what the map shows: "Flows to E3", naming the Target or the unit nearest the end the water runs to, or why the line has no direction, for example "No direction: its chain has no source or base pumper." When a line's chain runs both ways, or a base pumper stands at each end, the row also says what settles it: a Base pumper, the lay marked under Laid by, or one engine made a Supply pumper. Setting the attack engine's Function to Base pumper settles most of these, and a line's Target settles that line.
The arrows show which way the water goes and nothing else. They move at one steady pace on every line, whatever the hose size, pump or pressure, and they don't show how much water flows or how long a line took to fill.
- In edit mode, the arrows stand still and point the way replay will run them, so you can check the direction before you replay.
- With reduced motion turned on in your device's settings, the arrows stand still in replay too.
- 3D and Street View don't show the arrows.
- A shared replay link doesn't draw hydrants, so there an arrow can start where no hydrant is shown.
The app reads the direction from the board, so a few layouts read the wrong way:
- An engine at the fire parked beside a hydrant, with no handline off it and no Function, reads that hydrant as the source of a line coming in to it, so the arrows run back out along the line. Set the engine's Function to Base pumper, assign its attack line, or set the line's Target, and they turn around.
- A line that carries water on from the base pumper to another engine points back toward the base pumper, and so does any line that carries water on past a unit the base pumper supplies. Set the line's Target to turn it around.
Undo
Each change to a Function, a lay, a Source or Target, or Charged and its times is one step for Undo, and undoing it also takes its entries back out of the event log. Redo puts both back. A Time to target mark undoes the same way. A line you finish with Done is one step with everything chosen under Details.